PT Santosa Makmur Sejahtera Energy

Kupang - NTT [2x18 MW CFPP]

28 Sep 2020Updates

Through PT Santosa Makmur Sejahtera Energy (“SMSE”), which currently operate 2×18 MW Coal Fired Power Plant (“CFPP”). EnTI is playing an important role in providing electricity to more than 30% of Timor Island electricity demand in Kupang, Nusa Tenggara Timur (“NTT”). EnTI envision to create the PLTU to become greener Power Plant.


The PPA between SMSE and PLN was signed on January 9, 2012. Known as PLTU Bolok Unit 3&4 currently operated by internal SMSE 1 year after COD in September 28, 2017


SMSE commits to empower people in order to support local development, and responsible business practice. SMSE has already succeeded to increase local employee to 40% by the end of 2019.